Re: question about upgrade to 11gR2 RAC

From: Avijit <avijit.bhowmik_at_gmail.com>
Date: Wed, 23 Jun 2010 00:49:56 -0700 (PDT)
Message-ID: <3d86c55b-0422-4c89-afa3-ba63c5922240_at_z8g2000yqz.googlegroups.com>



On Jun 22, 11:25 pm, Mladen Gogala <gogala.mla..._at_gmail.com> wrote:
> On Tue, 22 Jun 2010 17:43:25 -0700, Avijit wrote:
> > Hi Mladen:
> > I am rellay interested to know how you performed theupgrade? Did you do
> > a rollingupgrade?
>
> No. That is not possible with 10.2. There was a hefty downtime involved.
>
> > Recently I was trying to test out a rollingupgradefrom a 2 node
> > 10.2.04 RAC to 11.2 on RHEL5. I have created a 1 node physical standby
> > 10.2.0.4 and converted it to logical standby. Now my plan is to stop the
> > logical apply andupgradeit to 11.2 and then start redo apply and once
> > it is in sync qwith the primary do a switchover. If you also used the
> > same process can you please share the steps here so that I can try to
> > move forward.
> > Thanks.
>
> Nope. Nothing like that. I shut down both instances, upgraded CRS, then
> ASM then database. DBUI gives you a lot of options. The RAC was down
> during the whole procedure, which took approximately 3 hours of downtime.
> The whole thing went through smoothly.
>
> --http://mgogala.byethost5.com

THanks for your reply.
Just a few clarifications:
1. did u shutdown the 10g ASM and db instances and the crs before u started the upgrade? Asking because, when I tried to run the runInstaller from 11g grid installation location it complained during configuration of SCAN that the vip is already assigned. But when I stopped the 10g CRS it did not complian and proceeded 2. will running runInstaller from grid installation directory upgrade both COS and ASM?...while starting runInstaller, it automatically selects the option "upgrdae grid infrastructure", does it mean both CRS and ASM?
Thanks Received on Wed Jun 23 2010 - 02:49:56 CDT

Original text of this message