Oracle FAQ | Your Portal to the Oracle Knowledge Grid |
![]() |
![]() |
Home -> Community -> Mailing Lists -> Oracle-L -> RAC Failover testing
Hi,
I am doing Testing on Oracle 9i RAC databases now. Ours is a 2-node RAC on IBM HACMP with GPFS.
The TNS entry on the client side, I use is given below:
MYDB =
(DESCRIPTION =
(ENABLE=BROKEN)
(FAILOVER=ON)
(LOAD_BALANCE=ON)
(ADDRESS_LIST =
(ADDRESS = (PROTOCOL = TCP)(HOST=RAC1.NODE1.com)(PORT=1521))
(ADDRESS = (PROTOCOL = TCP)(HOST=RAC2.NODE2.com)(PORT=1521)))
(CONNECT_DATA = (SERVICE_NAME=FNWFI1) (FAILOVER_MODE=(TYPE=SELECT)(METHOD=BASIC)(RETRIES=250)(DELAY=5)))
For Failover testing, I connected to the first node, and ran a long SELECT
query.
When the SELECT runs, I shut down the instance in the first node, with
"shutdown immediate" command.
I get the following message.
960 rows selected.
SQL>
SQL> ex
ERROR:
ORA-25408: can not safely replay call
Why this is happening, as I am using (ENABLE=BROKEN) and (TYPE=SELECT) options???
Surprisingly, the test succeeds on some other servers with the same DB
Physical structure
and memory parameters, by automatically failing over the SELECT query to the
surviving node, and without the
query being halted.
Is there any Operating System setting we need to set for successful failover?
Thanks in advance,
Best Regards,
Anurag
-- http://www.freelists.org/webpage/oracle-lReceived on Fri Aug 25 2006 - 12:17:21 CDT
![]() |
![]() |