Oracle FAQ | Your Portal to the Oracle Knowledge Grid |
Home -> Community -> Usenet -> c.d.o.server -> Log switching at a specific time interval
Hi all,
I want to force a log switch every 20 minutes at a minimum, or the normal event of the log filling - which ever comes first.
Can I do that by setting some init.ora params or do I need to create a job that runs every 20 minutes that exec's ALTER SYSTEM SWITCH LOGFILE command?
How do I do that?
Oracle 8.1.5 Received on Wed Sep 26 2001 - 12:10:08 CDT