tdrudy_at_ix.netcom.com wrote:
: I'm familiar with 7.2 and 7.3, but not 7.1 However, if you have a
: powerful enough server with enough and fast-enough CPUs and RAM, ...
(There's no such thing.)
: ... you may
: want
: to try COMPUTE first before playing with the ESTIMATE percentages. I
: suspect
: you may do the trial-and-error method to arrive at a satisfactory
: balance between speed and validity.
That does seem to be the way we're going. We don't have enough hours in the night to do a COMPUTE (or even a 20% ESTIMATE) on some of our larger tables. I'm putting most of them in at 20% and then lowering as needed.