How are you backing up GI Home?

You might be better off to simply install Grid Infrastructure from scratch on the DR Site. The issue is that any cloned (pure filesystem copy), will refer to the OCR/Voting disks that will contain registry entries to the resources within a cluster. You would at the very least need a) OCR/Voting disk backups and b) the GI Home binaries. Then, most likely, unzip binaries, restore disks and attach storage, hope that your host names are the same, and reconfigure GI.

To go through that process would require a lot of time, where as a fresh install is cleaner. The steps for those are very well documented :)

Cheers,
Maaz

On Thu, Dec 12, 2013 at 2:06 PM, Sanjay Mishra <smishra_97_at_yahoo.com> wrote:

> Nassyam
>
> Create Dataguard from 4node to 2 node is not an issue. The main
> requirement is how to clone Oracle Grid infrastructure using the backup
> taken for software on Primary site. It is DR exercise where Database
> restore is not a challenge as long as Grid infrastructure is ready. So key
> challenges are to identify the various script to be executed after the
> Software from one of the node is restored on the DR exercise server and how
> to create the various configuration files including ASM based ocr/voting
> disk and other ASM configuration.
>
> Once this is done, Database cloning using Tape restore will not be an
> issue. This is one time exercise to check and document the procedure to
> rebuild the environment from offshore tape backup
>
> TIA
> Sanjay
>
>
> On Thursday, December 12, 2013 1:52 PM, Nassyam Basha <
> nassyambasha_at_gmail.com> wrote:
> Hi Sanjay,
>
> Are you looking for 4-node to 2-node DR setup?
>
> If so you can refer below links. I usually refer MAA documents.
>
>
> http://www.oracle.com/au/products/database/maa-wp-10g-racprimaryracphysicalsta-131940.pdf
>
> http://www.oracledba.org/11gR2/dr/11gR2_dataguard_RAC_to_RAC.html
>
> documentsay point to 2-node standby or 3-node, you may need to perform
> changes only few parameters like FAL_SERVER, LOG_ARCHIVE_CONFIG so on. You
> will get idea if you refer those links.
>
> Documents you may not get exactly as per your environment, you can refer
> them and of course you can modify steps as required.
>
> Hope this helps.
>
> But the below question is confusing still, can you describe more ?
>
> what are the steps for Grid Infrasturcture cloning?
>
>
> Thank you,
> Nassyam Basha
> Sent from iPhone
>
> On Dec 12, 2013, at 11:48 PM, Sanjay Mishra <smishra_97_at_yahoo.com> wrote:
>
> Hi
>
> Can anyone share the doc/reference for doing DR exercise for 4-node
> Primary RAC (11g R2) on 2-node DR RAC ? We have 4-Node Oracle 11g R2 RAC
> with 8 Databases using ASM based OCR/Voting and Databases on Linux
> environment. Now Company wants to perform a DR exercise where backup from
> Primary Tape will be used to create the DR environment using only 2nodes.
> So I appreciate if someone share experience in RAC cloning/Setup as what
> are the steps for Grid Infrasturcture cloning.
>
> TIA
> Sanjay
>
>
>
>

-- 