Home » Server Options » RAC & Failsafe » RAC failover and failback
RAC failover and failback [message #190104] Tue, 29 August 2006 05:11 Go to next message
alanm
Messages: 284
Registered: March 2005
Senior Member

Hello All,
I have had to perform a 'failover' this morning on a system because the RAC SAN failed. the system is now running on the DR server. I have not as yet carried out a fail back. can someone describe the steps involved in failback, or point me in the direction of some documentation.

regards

Alan
Re: RAC failover and failback [message #193440 is a reply to message #190104] Sat, 16 September 2006 15:20 Go to previous messageGo to next message
kimant
Messages: 201
Registered: August 2006
Location: Denmark
Senior Member
Hi

You do not give many details about Your system and the state.
I assume that You have Your SAN up again.

You could make the previous primary node a standby, and then swithover to it?

These links might be usefull:

http://download-uk.oracle.com/docs/cd/B19306_01/server.102/b14196/rac006.htm

http://download-uk.oracle.com/docs/cd/B19306_01/server.102/b14230/toc.htm

http://download-uk.oracle.com/docs/cd/B19306_01/server.102/b14230/sofo.htm

Br
Kim
Re: RAC failover and failback [message #193469 is a reply to message #190104] Sun, 17 September 2006 11:58 Go to previous message
alanm
Messages: 284
Registered: March 2005
Senior Member

ty for the documents.

cheers
Previous Topic: Need test documents for RAC failover Scenarios
Next Topic: how can i plan and configure the oralce 9.2 rac for 4 node of ibm p550 cluster?
Goto Forum:
  


Current Time: Thu Apr 18 04:55:36 CDT 2024